Memphis Visitor Center
Site horizontal control design and drawings for construction layout. The layout design will be coordinated with your office and incorporate applicable TDOT design elements. Site retaining wall design (if required). There is currently no site topo survey or new layout available, but based on site visits and conceptual layouts, the necessity for retaining walls in the east portion of the site is a possibility. This will be a separate additional services item in the Fee Schedule. Portland Cement Concrete (PCC) paving layout and jointing design and drawings.
Site grading and storm drainage design and drawings. Site storm water detention analysis and design as required by City of Memphis code – see items 9 and 10 on page 2 of this proposal. Utility (domestic water and site fire protection) design and drawings. Sanitary sewer design and drawing – see item 3 on page 2 of this proposal. Erosion control design and drawings. Tennessee Department of Environment and Conservation Storm Water Pollution Prevention Plan (SWPPP.) and Notice of Intent (NOI.) submittal preparation (submittal fee to be paid by Owner). Sections and details as required and recommended. Pavement design recommendations will be by others – see item 6 on page 2 of this proposal. Post Construction Runoff Control Plan (PCRCP) as required by the City of Memphis. Technical specifications as required in CSI format. Documents preparation in ACAD format as required for all submittal phases, Owner reviews and City of Memphis approvals.